Table 2.  Calculated peak and average power. Data are means (ąSD).

Time

Peak Power (W)

Average Power (W)

Pre-Test

4020 (1078)

2173 (518)

2 minutes

3372 (1028) *

1831 (491) *

7 minutes

3552 (1036) *

1925 (496) *

12 minutes

3602 (1112) *

1952 (537) *

17 minutes

3622 (1073) *

1962 (517) *

22 minutes

3666 (1087) *

1986 (524) *

27 minutes

3726 (1128) *

2017 (546) *

32 minutes

3786 (1116) *

2049 (537) *

* Denotes p < 0.05 compared with pre-test at the 0.05 level